Wrigley Field

Owner: Chicago Cubs Baseball Club, LLC
Location: 1060 W. Addison St.
Year Completed: Phase 2 (2016), Phase 3 (2017), Phase 4-6 (2018)
Surface Area: Open Air Ballpark Stadium which seats 41,649

Description: ALL proudly provided renovation and new construction services for Wrigley Field from October 2015 thru October 2018. We successfully completed phases 2-6 during this period. The phases included the following scope:

Phase 2 Wrigley Field Renovations & Historic Caretaker’s House-10/2015-4/2016
• CMU & Brick construction
• Brick salvage and restoration
• Reinstallation of historic salvaged bricks to exterior facade
• Building Expansion Joint Assemblies

Phase 3 Pedestrian Plaza (Gallagher Park) & Field Wall Renovations-10/2016-04/2017
• Architectural Precast walls/stages
• Brick & Stone Clad Masonry Planters
• Architectural Cast Stone Fountain Feature
• Selective demolition, salvage, and reinstallation of Baseball Field Wall Bricks
and stone copings

Phases 4-6 Wrigley Field Stadium Renovations – 10/2017-10/2018
• New masonry construction at clubhouse, concourse, mezzanines, and suite
levels
• Architectural think brick construction at all renovated owner and fan suites
• Glazed block wall construction at renovated restrooms
• New construction of CMU block wall passenger elevators
• New brick wall and clay tile coping for new fan ticket booths